( 01 ) — Use Case · Maritime

    Ship recycling,
    with a record past the yard gate.

    Today steel and equipment from a recycled vessel leave the yard as mixed scrap, sorted by eye, and no record follows them. ContainerGrid puts the shipowner, the yard and the buyers of steel and equipment under one contract and one record: what leaves the yard, at which grade, to whom, settled per lot.

    ( 02 ) — What you get

    Know what a vessel is worth at end of life, and prove where it went.

    Terms agreed before arrival

    Grades, prices and qualified buyers are set with the yard before the vessel arrives, not after.

    Sold by grade, not by eye

    Steel, non-ferrous metals and reusable equipment are recorded by grade and weight, so each sells for what it is.

    Equipment back into use

    Engines, pumps and other equipment that can run again are separated and offered for reuse before the hull is cut.

    A record past the yard gate

    Every lot is on one record from the yard to final processing, ready for the documentation that ship-recycling rules ask for.

    ( 03 ) — Who is at the table

    One vessel, four sides of the deal.

    Shipowners

    Sell the vessel on terms you set, and keep the record of where it went.

    For asset operators and managers →

    Recycling yards

    Win vessels from owners who need proof, and earn a premium for steel sorted by grade.

    For recyclers →

    Steel mills and equipment buyers

    Buy ship steel and equipment to spec, with documented origin, under contract.

    For material buyers →

    Cash buyers and supervisors

    Run the sale and the supervision on one record that owner, yard and buyer all accept.

    ( 04 ) — Why now

    Ship recycling has become a documented process.

    The Hong Kong Convention has been in force since June 2025, and EU-flagged vessels must be recycled at approved facilities under the EU Ship Recycling Regulation. Owners now need evidence of what happened to their vessel, not only a sales contract with a cash buyer.

    ( 05 ) — The product
    In the product

    One delivery, from terms to payment

    Program rulesDemo data
    • Minimum weight per pick-up10 kg
    • How the plant weighsWeighbridge, slip required
    • Weight tolerance3 %
    • GradeGrade A
    • Contract-ready threshold5,000 kg

    Every change is logged with who, when and why.

    The same product runs every program, whatever the material or the industry.

    ( 06 ) — How it runs

    Three steps to a running program.

    STEP 1

    Agree

    Agreed once: quality, volume, price and who gets the quality bonus.

    STEP 2

    Connect

    Your existing partners get connected, each on its own screen. Nobody gets replaced.

    STEP 3

    Settle

    Every delivery is recorded once and paid on that record.